HEATPUMP
INFORMATION
How long will it take to install?
A standard back-to-back split system installation (where the indoor
unit is mounted under 3.0 metres away from the outdoor unit) should take
a competent installer approximately 4-6 hours. If the indoor unit is
mounted much further from the outdoor unit then the installation will
take most of the day if not a day and a half.
A ducted unit installation will take anywhere from 2-3 days to a week
or so depending on how complicated the system is.
“Choose a contractor who will install a reputable and reliable
heatpump that is sized correctly for your application”
© 2005 - All Rights Reserved
|